surPLUShome

A few nice views of the surPLUShome of Team Germany Solar Decathlon 2009.

5 Photos

Team Germany in public

The Topping-out ceremony, open house at the day of architecture, VIP visit at the building site and a lot of camera crews reporting about the surPLUShome in the TV.

18 Photos

Aspect building site

Leveling the building area and building the scaffolding.

7 Photos

Aspect woodwork

Structural work with wood.

18 Photos

Aspect prefabrication

Prefabrication of the walls and the ground floor in the carpenter center in Biberach and fastening the prefabricated intermediate level and ceiling.

21 Photos

Aspect building envelope

Fastening the prefabricated VIP (vacuum insulation panel) and windows.

12 Photos

Aspect airtightness

Fastening the vapor barrier and preparing everything for the Blower-Door-Test.

9 Photos

Aspect building services

Building services - heat pump, water pipes and ventilation

13 Photos

Aspect building automation

Building automation - electric control cabinet, cable channel and in-wall cables

10 Photos

Aspect interior

Finishes of the Interior - parquet and wall paneling

12 Photos

Aspect disassembly in Germany

Disassembly the surPLUShome in one day.

35 Photos

Aspect transport

Let´s pack a 11.5 feet wide, 13 feet high and 40 feet long packet, to ship it to Washington D.C.

17 Photos

Team Germany at work

All members of the Solar Deacthlon 2009 Team Germany

63 Photos

Integral ceiling

Low build up of the ceiling with excellent wingspan including building services and building automation as well as power generation.

19 Photos

Integral multifunctional body

Multifunctional body including the stairs, storage space, lighting, building services and building automation, kitchen and bathroom.

12 Photos

Integral solar active facade

Building envelope including the electricity generating photovoltaic facade with integrated blinds.

18 Photos