Dry walling

Posted by Andreas
26
Jul

The last days we worked on the dry walling oven though it does not look dry at all. We leveled the revision openings as well as the wall cladding made of plaster boards.

The plasterboards are designed as latent storage by integrating phase change material (PCM) in their body. They will help to keep the building at the estimated temperature range in the Solar Decathlon competition. And they also absorb high humidity for an optimized indoor climate.

Kitchen: cabinets

Posted by Andreas
24
Jul

Franziska and Angela installed the self made kitchen cabinets. The colored medium density fiberboards (MDF) are a new development and the look really nice. Their grey color is an allusion to concrete, but it´s warm when the hand touches the material.

Bathroom: sink installation

Posted by Andreas
24
Jul

Claudia installed the sink today. Our washbasin will be very specific because it features no basin but a baffle plate made of glass. The rest of the planar basin will feature the parquet as surface all over.

Parquet #2

Posted by Andreas
24
Jul

Yesterday we placed the parquet in the sleeping area of our solar home. The stairs are not jet mounted but prepared for the parquet as well.

The sleeping area can be used as working area as well. Therefore one can see the cable conduits open for electrical installation at the walls. We will serve the working space with current, lighting and local area network (LAN).

360° Panorama #3

Posted by Andreas
23
Jul

Frauke made another 360° panorama animation of our house today.

Link to panorama anmimation…

Water installation

Posted by Andreas
23
Jul

Today we did a test run of the water installation inside of our Solar Decathlon home.

We used innovative piping for fresh water and sewage. Especially the noise reduced sewage piping will help us to reduce the noise level in the whole solar home.

21
Jul

Today we installed the Heroal profiles on the roof.

Deck construction

Posted by Andreas
19
Jul

Today we built some more deck modules

Parquet

Posted by Andreas
17
Jul

Jasmin is placing the parquet on the gallery.

Deck modules

Posted by Andreas
17
Jul

This evening we finished the first 4 modules of the deck.